Challenge

The earthquake and tsunami of March 2011, which resulted in the shutdown of most of Japan’s nuclear powered electricity generating capacity, had the flow-on effect of creating pressure to reduce industry energy consumption, including that used for air conditioning.

Solution: Climate Wizard Supplementary Cooling

Kurogane Kosakusho chose to install Climate Wizard to provide half their factory cooling requirements, allowing them to switch off half of the Packaged Air Conditioners (PACs) and make operational energy savings of around 37% over the summer period.