CASE STUDIES

Tsuchiya Manufacturing Jakarta, Indonesia


Challenge

To provide quality economical ventilation and cooling for a plastic injection moulding facility in the tropical climate of Indonesia.

Solution: Climate Wizard Stand Alone Cooling

Twelve Climate Wizard model CW-H15 were installed along one wall of the moulding facility with the cold air being discharged at operator height and directed across the work area. On the opposite side of the facility, extraction systems were installed to promote the flow of air across the work area and then to outside. The installation achieved the objective of concentrated cooling in the work area without the need to treat the whole building.